Location: Neukölln lock (Berlin-Neukölln)
 Client: State of Berlin, represented by the Senate Department for the Environment, Mobility, Consumer and Climate Protection
 Project duration: 2020 to 2026
 Planning: As-built survey, object and structural planning
 Execution: expected from 2027
 Total costs: expected to be 62 million euros
 BIM use cases: 000, 010, 030, 040, 050, 060, 070, 080, 090, 100, 110, 130
From the basic evaluation to the 3D as-built model – New construction of the Berlin-Neukölln lock